{主关键词}

A | New Delhi, Oct 13 (UNI) Municipal Corporation of Delhi (MCD) has relaxed the condition of fire No Objection Certificate (NOC) for sanction of building plan for residential properties.
As per the new rule, no NOC will be required from Delhi Fire Service in the case of sanction of building plans of residential building consisting of Ground Floor plus three additional floors with stilts for parking having, overall maximum height of 17.5 meters, the Civic agency in a statement stated.
MCD has taken this decision after the recent judgment passed by the Supreme Court and clarification rendered by Delhi Fire Service. Before this, obtaining prior NOC from the Fire Department was mandatory for the sanction of residential building plans. However, MCD has clarified that the new relaxation rule shall not apply to those residential buildings, wherein stilt is not proposed by the applicants, it stated.
MCD said this expedient relaxation to the public will abridge the approval-processing of such building sanction cases. Citizens may avail the benefit by submitting the applications for sanction of residential buildings plan in the above manner, without submission of NOC of fire department, it added.
UNI CM GNK。

B | 8月26日消息,利民推出TR-TG1200 MAX系列电源,额定功率1200W,已通过80 PLUS金牌认证,提供黑色与白色两种外观版本,起售价为499元。 该电源采用紧凑型设计,整体尺寸为150 x 140×86mm,兼容性出色,便于安装和理线。
其符合ATX 3.1与PCIe 5.1标准,内部采用LLC谐振+DC-DC电路架构,并选用全日系电容,在50%负载下转换效率超过90%,能源利用表现优异。
安全性方面,TR-TG1200 MAX系列配备了完整的电路保护机制,包括过流保护(OCP)、过压保护(OVP)、短路保护(SCP)、过功率保护(OPP)、欠压保护(UVP)及过温保护(OTP),确保高负载场景下稳定可靠运行。

C | 此外,该电源采用全模组设计,板载原生12V-2×6供电接口,并标配压纹模组线材,线身柔软、质感仿若编制,便于弯折走线,有效提升装机便利性与线缆管理效率。 购买链接:京东(499元)

D |
Current article:http://7wn2.tuncuansazhuandengqiaofen.bond/zgdk0r/20260826/7504988.html
Published on:02:15:39
我的网站热门国内